CNC SHUTTLE  
PREVIOUS MACHINE 857 NEXT
PART: Die cast aluminum electrical box
   
The operator actuates Dual Banner Light Touch cycle start, the door closes, the fixture automatically clamps the part and the machining operations at Station One begin. Cycle time is 45 seconds.
 
(1) Precision bore module (4 holes)
(6) RTT drill modules (88 holes)
(2) RTT tap modules (28 taps)
(1) Precision mill module (mill slot)
   
Operator view of fixture. Fixture is hydraulic on a CNC precision slide.
 
         

Home Machines Fixtures Standards
Electrical RTT Modules Broken Tool Documentation Publications
Company Profile Representatives Site Map